Liberty Center at Monarch Lakes
Miramar, Florida

Work done while employed by RLC Architects, Architect of Record.


New tilt-wall construction of a four-story office building core & shell, totalling
approximately 110,000 sf., 1.5 acre lake, 400 surface parking spaces.  This
building is LEED     Silver, the first in the City of Miramar.

Vicki Soderlund's role as Project Manager consisted of coordinating engineers,
LEED     consultants, and an in-house team of architects to produce the
construction documents. In addition, during the construction of the project to
ensure a successful completion. Vicki Soderlund worked closely with developer,
the General Contractor, the project designer, the city, and governing agencies
throughout the process in order to facilitate the architectural, various approvals,
and the construction process.
After
Before
.
951 Yamato Office Building
Boca Raton, Florida
Work done while employed by RLC Architects, Architect of Record.


The project consists of facade and basic core functions renovation of an existing
two-story office building shell, totalling approximately 180,000 sf., and creating a
new entry feature.

Vicki's role as Project Manager included working with the owner, project designer,
engineers, and an in-house architecture team during the construction documents
process to ensure a smooth process and quality control. In addition, Vicki's
substantial involvement during the construction process included frequent site
visits, meetings, review of shop drawings, and coordination between the General
Contractor and the design team in resolving conditions unique in a large scale
renovation project.
.
Orange Bowl Committee Headquarters

Work done while employed by RLC Architects, Architect of Record.


The project consists of a renovation and addition of a partial second floor to an
approximately 22,000 sf building.

Vicki Soderlund's role as Project Manager consisted of working with the Orange
Bowl Committee representatives, the project designer, the General Contractor,
engineers, and an in-house architectural team to oversee the construction
documents and permitting process and the construction administration process.

In addition, this project provided a unique opportunity for Vicki to work with the
Committee representatives and building designer to provide coordination for
limited interior design services; selecting new furniture, interior colors, finishes
and coordination with the display design company.



Photography by professional photographer for RLC Architects
.
.
Brandywine Office Building
West Palm Beach, Florida

Work done while employed by RLC Architects, Architect of Record.


The project consists of interior renovations to common areas of a three-story
office building.

Vicki Soderlund's role as Project Manager consisted of collaborating with the
Owner and firm Principal to produce various options. Once the design was
selected, Vicki coordinated an in-house architecture team and engineering
consultants to provide marketing boards and drawings for construction. In
addition, Vicki worked closely with the owner and General Contractor during the
construction process to facilitate various phasing requirements of the project due
to building occupancy.






Rendering by RLC Architects
Oxygen Corporate Headquarters
Pompano, Florida

Work done while employed by RLC Architects, Architect of Record.


The project consists of schematic interior design and material selection for lobby,
office areas, lunch rooms and restrooms for a new corporate headquarters
building.

Vicki Soderlund's role as a member of the in-house architectural team consisted
of working with the owner and product representatives to provide initial design
concepts for interiors, based on budgets. Work included  floor patterns, ceiling
design, lighting selection and layout, cabinetry, and decorative material selections.







Presentation by Vicki Soderlund for RLC Architects
.
Office
RETURN TO TOP
.
Gold Coast Real Estate School at Dolphin Mall
Dade County, Florida

Work done while employed by RLC Architects, Architect of Record.


The project consists of new tilt-wall construction of an office/classroom building,
totalling approximately 20,000 sf., 140 parking spaces.

Vicki Soderlund's role as Project Manager consisted of oversee of the
construction document process and quality review. In addition, oversee of the
construction administration process and coordination of shop drawing review.
TM
TM
.
BG Capital Group Tenant Improvement
Plantation, Florida

Work done while employed by RLC Architects, Architect of Record.


The project consists of a 26,000 sf,  2 floor tenant improvement at Cornerstone
Business Park in Plantation.

Vicki Soderlund's role as Project Manager consisted of particiaption in the space
planning of the project and oversee of the construction document process. In
addition, oversee of the construction administration process and shop drawing
review.
.
RESTAURANT
HOSPITALITY
SINGLE-FAMILY
INDUSTRIAL
OFFICE
RETAIL
MULTI-FAMILY
.
ART
V  i  c  k  i    S  o  d  e  r  l  u  n  d   A.I.A., N.C.A.R.B., C.I.D., LEED      
A.P.
TM
PORTFOLIO
.
.
.
.
.
.
.